Need help reading this page?

Project Ambition: Transforming Uxbridge College

Exciting changes are coming to Uxbridge College. Project Ambition is a bold, once-in-a-lifetime transformation designed to create a state-of-the-art, sustainable, and inspiring campus for our students and staff.

Look out for updates as we bring this exciting vision to life!

  • Our visionary project

    This visionary project will enhance key areas, including:

    • A revitalised reception area
    • A modernised Mall
    • A refreshed Refectory
    • Reimagined outdoor spaces (front and courtyard).

    The project team is also exploring improved pedestrian areas, and the overall design aims to be both functional and visually appealing, with landscaping and seating.

    The project team is in the process of reviewing layout options, and the integration of garden / green spaces.

    We’re actively gathering input from students and staff to shape the future of our campus—ensuring it reflects the values, innovation, and excellence of our community.

    The project will be developed with the intention of minimising disruption to campus users and our wider community.

  • Campus Entrance and Exit Routes

    There will be important changes to vehicle access at Uxbridge Campus, effective from Tuesday, 22nd April (after the Easter break). These changes are being introduced to ensure the safety of all College students, staff, and visitors, and to clearly define pedestrian and vehicle routes in and around the campus.

    pdf Entrance and exit map (1.27 MB)

    Key Changes:

    • All vehicles (staff, students, visitors, parents, taxis/Ubers) must enter via Gatting Way through the rear/large car park entrance.
    • No vehicle access through the Park Road entrance, except for select deliveries and emergency vehicles.
    • Disabled bays (front car park) and electric car charging bays (near K Block) are still accessible, but entry must be via Gatting Way.

  • Our Neighbours

    A message from the Principal, Uxbridge College

    Dear Neighbour,

    Firstly, I would like to apologise for any inconvenience caused by ongoing improvement works at Uxbridge College.

    Thank you for your patience and understanding.

    We do not take for granted the continued patience and understanding of our neighbours and residents while these important works are carried out.

    Please be assured that every effort is being made to minimise disruption to the surrounding community. This project is complex, but works are being carefully planned to reduce impact wherever possible.

    Transforming Uxbridge College

    Here’s some context about the work taking place. It is a major investment to create a modern, sustainable, and welcoming campus for students, staff, and visitors. Improvements include:

    • A revitalised reception area
    • A modernised Mall
    • A refreshed Refectory
    • Enhanced outdoor spaces, including the front entrance and courtyard areas.

    The project team is also exploring improved pedestrian areas, landscaping, seating, and additional green spaces to create a more attractive and functional environment for everyone.

    Changes to Campus Access

    To improve safety in and around the campus, vehicle access arrangements have changed.

    Key changes include:

    • All vehicles must enter via Gatting Way through the rear car park entrance
    • No general vehicle access via the Park Road entrance
    • Disabled parking bays and electric vehicle charging points remain accessible via Gatting Way


    Current Works and Temporary Arrangements

    The next phase of works began in May 2026 and includes renovations to the new reception area and Learning Resource Centre entrance.

    During this period:

    • A temporary visitor reception is operating from A007
    • The Mall exit is being used as a staff and student entrance/exit
    • Part of the visitor car park is temporarily closed to accommodate site works


    Keep in touch

    If you have any questions regarding access or the project, please contact the team on:

    • 01895 853333 
    • This email address is being protected from spambots. You need JavaScript enabled to view it.


    Thank you once again for your understanding.

    Clive Hodge, Principle, Uxbridge College

Latest update: The Next Phase

The next phase of Project Ambition began on Friday 1st May 2026. This includes renovations to our new reception and the Learning Resource Centre entrance. During this time, we will be operating from a temporary reception and student entrance. 

From the beginning of May there has been a new temporary visitor reception located in A007, and The Mall exit converted to a staff and student entrance and exit.

From Tuesday 27th April 2026, 50% of the visitor's car park will be closed for site compound.

If you have any questions regarding access please contact our reception:

  • 01895 853333
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Image credit: MICA Architects